Chad was so busy this weekend working on the bathroom. Here is what he accomplished:
1. Moved plumbing to accommodate new positions of tub, toilet, and sink
2. Leveled half of the floor (section under the tub)
3. Built frame for the tub/shower
4. Temporarily installed the tub (need to install mortar bed next weekend)
5. Installed tub and shower fixtures
6. Removed old tub
2. Leveled half of the floor (section under the tub)
3. Built frame for the tub/shower
4. Temporarily installed the tub (need to install mortar bed next weekend)
5. Installed tub and shower fixtures
6. Removed old tub
I give you guys credit! That is a lot of work! Hopefully you haven't had any set backs, good luck with the rest of the remodel!